Syndicate Legal Advisory Services provides nationwide legal document preparation services for entities preparing applications for standard design certifications from the U.S. Nuclear Regulatory Commission (NRC) under 10 C.F.R. Part 52, Subpart B. We prepare the application materials and related supporting documents based on the design information and specific instructions you provide.
Documents Commonly Prepared
We prepare documents associated with an NRC Design Certification application, including:
General Information Sections: Completion of the general information required under 10 C.F.R. § 52.46, covering applicant identity and related details, based on the information you supply.
Technical Information Sections: Preparation of the final safety analysis report content, site parameters, structures, systems, and components descriptions and analyses, inspections, tests, analyses, and acceptance criteria (ITAAC), probabilistic risk assessment descriptions, and other technical information under 10 C.F.R. § 52.47, based on the technical details and instructions you provide.
Environmental and Other Supporting Materials: Preparation or organization of the environmental report and other required attachments, based on the documents and information you supply.
Amendments or Updates: Preparation of amendments or updates incorporating corrections, based on the corrected or updated details you provide.
Documents are prepared for submission to the NRC Document Control Desk in accordance with applicable filing requirements. A standard design certification under 10 C.F.R. Part 52 certifies a final standard design for a nuclear power facility through rulemaking and is codified as an appendix to Part 52; the application must contain a level of design information sufficient to enable a final conclusion on all safety questions associated with the design; certifications are typically valid for 15 years and may be renewed; fees apply under 10 C.F.R. Part 170; clients remain fully responsible for determining eligibility, the accuracy and completeness of all information, timely submission and fee payment, satisfaction of technical and environmental requirements, and compliance with 10 C.F.R. Part 52.
